CURRENT PROJECTS

Rockford Public Schools-East Rockford Middle School:

Adding heating and cooling to the addition of the orchestra room

Battle Creek VA Backflow Preventers- Hart-Dole-Inouye Federal Center:

Installation of several backflow preventers

Grand Rapids Community College- Tassel M-TEC Building:

Replacing current boilers with high efficiency condensing boilers, as well as replacing the
heating system pumps.

Kentwood Public Schools- Glenwood Elementary:

Replacing two existing boilers with two high efficiency condensing boilers. Replacing all (25)
VUV (Vertical Unit Ventilators). Adding radiant panels. Upgrading existing heating and cooling
equipment so it can be controlled by a computer.

GSA (General Services Administration)- Charles Chamberlain Federal Building:

Replacing an air handling unit and associated ductwork. The existing ductwork was covered in
asbestos, so AMR is also tasked with abating the asbestos.

Gerald R. Ford Job Corps Center

Installing 4 new commercial water heaters, replacing a circulating pump & commissioning the existing water softener repair system.

LV Eberhard Center- Grand Valley State University:

Performing various HVAC work on the 7th floor.